Skip to content

Civil Engineer DK

Bridging knowledge gaps in civil engineering

Menu
  • Civil engineering
    • Geotechnical Engineering
    • Surveying
    • Building Material
    • Highway Engineering
  • Construction
    • Railway
    • Road
    • bridge
    • building
    • House Construction
    • QA/QC
  • Construction management
    • civil engineering software
  • Difference Between
  • About
    • Contact
Menu

Types of Estimates in Civil Engineering

Posted on 18/02/202518/02/2025 by CivilEngineerDK

Estimating is a crucial part of civil engineering that involves predicting the costs, materials, labour, and time required for a construction project. Proper estimation ensures efficient resource allocation, project feasibility, and financial planning. In India, estimates follow standards and guidelines provided by the Bureau of Indian Standards (BIS) .

What is an Estimate?

An estimate is the approximate calculation of the cost of a construction project, including materials, labour, equipment, and overhead expenses. The accuracy of an estimate depends on project details, market rates, and construction methods.

The primary objectives of estimation are:

  • Determining project feasibility
  • Budget allocation
  • Resource planning
  • Avoiding cost overruns

Types of Estimates in Civil Engineering

1. Preliminary Estimate (Rough Cost Estimate)

  • Used in the initial stages of a project to assess its feasibility.
  • Based on past projects, per square metre rates, or lump sum values.
  • Commonly used for government approvals, budget allocation, and large-scale planning.
  • Example: If a municipal corporation wants to build a new hospital, a rough cost estimate is prepared based on similar hospitals previously constructed.

2. Detailed Estimate

  • Provides an in-depth calculation of materials, labour, equipment, and contingencies.
  • Prepared using item-wise analysis as per the Schedule of Rates (SOR).
  • Includes quantities, unit rates, and total cost breakdown.
  • Required for tendering, contractor payments, and financial approvals.
  • Example: A bridge construction project will have a detailed estimate specifying the quantity of cement, steel, and other materials required, with respective costs.

3. Quantity Estimate (Material Estimate)

  • Focuses on material requirements for procurement planning.
  • Ensures timely availability of resources.
  • Commonly used in large infrastructure projects.
  • Example: In road construction, a quantity estimate will detail how much bitumen, aggregates, and concrete will be needed for each kilometre.

4. Revised Estimate

  • Prepared when the original estimate is exceeded by more than 5% due to changes in design or material costs.
  • Requires approval from the concerned authorities.
  • Example: If the cost of steel rises significantly during the execution of a high-rise building, a revised estimate will be needed to accommodate the price hike.

5. Supplementary Estimate

  • Additional estimate prepared for extra work beyond the original project scope.
  • Ensures smooth execution of unforeseen modifications.
  • Example: If an additional parking lot is to be added to an existing commercial complex, a supplementary estimate will be created for the extra cost.

6. Plinth Area Estimate

  • Based on the built-up area of a structure multiplied by the construction rate per square metre.
  • Used for quick cost approximation.
  • Example: A residential building with a plinth area of 200 square metres and a per-square-metre construction cost of ₹15,000 will have an estimated cost of ₹30 lakhs.

7. Cube Rate Estimate

  • Uses the volume of the structure (length × width × height) multiplied by a standard rate per cubic metre.
  • Suitable for multi-storey buildings.
  • Example: A commercial tower with a total volume of 10,000 cubic metres and a construction rate of ₹5,000 per cubic metre will be estimated at ₹5 crore.

8. Annual Repair and Maintenance Estimate

  • Prepared for regular upkeep of infrastructure.
  • Includes costs for minor repairs, repainting, and restoration works.
  • Example: For a government office building, an annual repair estimate might include ₹2 lakhs for plumbing, ₹3 lakhs for electrical work, and ₹5 lakhs for painting.

IS Codes and IRC Guidelines for Estimation

The following standards govern estimation in India:

  • IS 1200: Method of Measurement of Building Works
  • IS 7272: Guide for Preparation of Project Estimates
  • IRC 84: Guidelines for Estimation of Road Works
  • CPWD Manual for Works Estimation

Download our IS code App for all kinds of Is codes in Civil engineering.

Estimate for Proposed Residential Building | Estimation of a Building with Plan

Applications of Estimates

  • Government Infrastructure Projects: Roads, bridges, and buildings.
  • Private Construction: Residential and commercial properties.
  • Industrial Projects: Factories, warehouses, and plants.
  • Renovation & Repair Works: Restoring old structures.

Advantages of Estimation

  • Ensures Financial Planning: Prevents budget overruns.
  • Aids in Tendering: Helps contractors bid competitively.
  • Reduces Material Wastage: Ensures efficient resource use.
  • Minimises Delays: Prevents cost escalations.

Disadvantages of Estimation

  • Inaccuracy Due to Market Fluctuations: Prices of materials and labour change frequently.
  • Errors in Calculation: Small miscalculations can lead to huge cost variations.
  • Time-Consuming Process: Requires thorough analysis and approvals.

Conclusion🎯

Estimation is a vital aspect of civil engineering that influences project cost, execution, and completion. By following standard guidelines and using accurate methods, engineers can ensure the smooth implementation of construction projects. In India, adherence to IS codes enhances the reliability and efficiency of estimates, leading to successful infrastructure development.

 

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Categories

  • architecture
  • building
  • Building Material
  • Civil engineering
  • civil engineering software
  • construction
  • foundation
  • Geotechnical Engineering
  • Highway Engineering
  • Reinforcement
  • Road
  • Surveying

Archives

  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023

Connect me on 👇

  • Instagram
  • Facebook
  • YouTube
  • Telegram
  • LinkedIn
  • X
©2025 Civil Engineer DK | Design: Newspaperly WordPress Theme